Your architecture practice uses Revit or Archicad, your staff have powerful workstations, your projects are centralised on a server or NAS, and Microsoft 365 supports day-to-day work. Yet the difficulties remain familiar: increasingly heavy models, growing exchanges with engineers, remote colleagues, drawings circulating across several platforms and an old version that cannot be found at the worst possible moment.

At the same time, proposals keep coming: move projects to the cloud, adopt a collaboration platform, replace the server, deploy an artificial intelligence assistant, automate site meeting minutes, renew the workstations. All may be useful. All require time, money and changes in habits. And they do not address the same problems.

A practice can invest tens of thousands of francs without addressing what is actually slowing its teams down. Conversely, a few targeted improvements can transform everyday work without replacing the infrastructure.

The right question is therefore not “which technologies should we adopt?”, but “what is preventing us from working as effectively as we could today?”

The essentials at a glance

  • Modernisation starts with measurement: lost time, risks, costs and dependencies.
  • BIM is first and foremost a method. The SN EN ISO 19650 series and its common data environment (CDE) matter more than the choice of platform.
  • Cloud is neither compulsory nor a backup: with Microsoft 365, protecting data remains the company's responsibility.
  • Hosting in Switzerland is not enough to guarantee sovereignty; the revised FADP, in force since 1 September 2023, requires knowing who can access the data.
  • AI should be judged on the complete process, including review. Before Microsoft 365 Copilot, SharePoint permissions need to be cleaned up.
  • The effective sequence: measure, secure, optimise, then transform.

An architecture practice's IT is a production tool

IT is involved in almost every stage of a project. During design, architects produce drawings, models, options and visualisations. During the planning stages, they exchange information with civil engineers, building services specialists, contractors and clients. On site, they consult documents, track outstanding issues and write meeting minutes. And for years afterwards, they must be able to retain, retrieve and pass on information.

IT therefore amounts to more than computers and licences: it is a chain linking people, data, applications and business processes. If just one link works poorly, the whole project may slow down.

Example: a well-equipped but inefficient practice

Consider a fictional practice with 18 staff using Revit, AutoCAD, Microsoft 365 and a local file server. The workstations are recent, the server has spare capacity and the licences are up to date. Yet:

  • teams waste time finding the right version of a file;
  • remote staff suffer slow synchronisations;
  • external engineers receive documents by email rather than through a structured sharing space;
  • meeting minutes are written manually, then copied into several tools;
  • backups run, but restores are never tested.

Should the computers be replaced, everything moved to the cloud or an AI solution purchased? Not before identifying the causes. Here, the workstations are not the problem: this practice mainly needs to organise its workflows and make its existing systems reliable.

Before modernising, identify what is really costing time

Modernisation starts with a review of the current situation. This need not be a multi-week audit, but it should be a structured analysis of the problems affecting production, covering five areas.

AreaQuestions to ask
Production performanceHow long does a model take to open? Which synchronisations are slow, and on which projects? Is the bottleneck the processor, memory, storage, network or model structure?
CollaborationAre exchanges with engineers smooth? Are versions clearly identified? Are IFC models exchanged and validated according to a known procedure? Are external access rights controlled?
Administrative tasksHow long do meeting minutes, reports, searches and files take? Which entries are repeated across several applications?
Security and continuityCan data be restored? Are accounts protected by strong authentication? Could the practice resume work after a major failure or attack?
Costs and dependenciesWhich licences are actually used? Which tools duplicate one another? Is the practice overly dependent on one supplier or one person?

The aim is a list of problems, with their frequency, consequences and likely causes. Modernisation can then follow business priorities rather than the latest market developments.

BIM: improve the method before investing in a platform

Adopting Revit, Archicad or a collaboration platform does not guarantee smooth projects. Collaboration quality also depends on how models are organised, responsibilities and information management.

The standards framework: the SN EN ISO 19650 series

In Switzerland, the reference for BIM information management is the SN EN ISO 19650 series. SIA technical specification 2051, long cited as the basis for the BIM method, was withdrawn at the end of 2024 precisely because this international series partly replaces it.

ISO 19650 defines the common data environment (CDE): the agreed source of project information, where each document exists once, with a known status (work in progress, shared, published, archived). A CDE is first a process; one or more software tools then implement it.

Revit and Archicad: the collaboration method matters as much as the server

For Revit, Autodesk distinguishes three approaches that are not interchangeable: file-based worksharing (local network only), Revit Server (multiple sites) and Revit Cloud Worksharing, included in the Autodesk BIM Collaborate Pro subscription. For Archicad, Teamwork collaboration relies on BIMcloud, a server application that must be sized as such.

We explain these constraints (latency, VPN, NAS and BIMcloud sizing) in our article Slow NAS in an architecture practice: diagnosing Revit, Archicad and storage.

The mistake to avoid: buying a platform without reviewing methods

A practice can have an excellent collaboration tool and still exchange important files by email, or keep several competing copies of the same documents. Before investing, define:

  • who produces information, and who approves it;
  • how revisions are managed and which version is authoritative;
  • which documents may be shared with partners;
  • how decisions are recorded.

BIM is more than a digital model: it is a working method and information governance.

Cloud or local infrastructure: move beyond the ideological debate

Cloud offers real benefits: remote collaboration, multi-site access, scalability and less hardware to operate. It also creates dependencies: Internet connectivity, provider availability, subscriptions, access performance and data retrieval conditions. Local infrastructure, meanwhile, involves hardware, maintenance, backups and a replacement plan. The right choice depends on usage.

Three illustrative scenarios

PracticeSituationPriority to explore
A – 8 architects, one siteWork mainly takes place in the officeWell-maintained local infrastructure, Microsoft 365 and external backups; full migration is not a priority
B – 25 staff between Geneva and LausanneFrequent work on the same modelsEvaluate multi-site BIM collaboration (Revit Server, Revit Cloud Worksharing, BIMcloud)
C – 15 architects, numerous engineering practicesDifficult document coordinationEstablish a structured common data environment rather than a new server

These examples illustrate a way of thinking; the actual decision requires a diagnosis.

Cloud does not replace backup

Microsoft 365 follows a shared responsibility model: Microsoft provides service availability, but protecting and restoring data remains the customer's responsibility. Recycle bins, versions and retention policies serve compliance, not recovery after ransomware or an administration error.

A dedicated Microsoft 365 backup (Exchange, OneDrive, SharePoint, Teams), stored outside the tenant, therefore remains necessary. The same logic applies to BIM platforms: with Autodesk, documents stored in the cloud remain available for only 30 days after the subscription expires.

Sovereignty: what hosting in Switzerland really means

Since 2019, Microsoft has offered Microsoft 365 from two Swiss regions, in Geneva and Zurich, with data at rest stored in Switzerland. That is an advantage, not a complete guarantee of sovereignty: a provider subject to US law remains affected by the CLOUD Act, which can require it to disclose data hosted outside the United States.

The revised Federal Act on Data Protection (FADP), in force since 1 September 2023, also requires security breaches to be reported promptly to the Federal Data Protection and Information Commissioner (FDPIC). A practice must therefore know where its personal data is held, who can access it, which processors are involved and how to retrieve its data when changing provider.

The right architecture is not the one with the most cloud services, but the one that meets the practice's constraints with controlled risks and costs.

Artificial intelligence: start with tasks that offer measurable value

AI offers real opportunities for architecture, but not every use case has the same maturity or profitability. Administrative, documentary, creative and technical uses must be distinguished.

Use caseWhat AI providesEssential safeguard
Meeting and site meeting minutesStructure notes, prepare a first draft, extract actionsHuman review: a misassigned responsibility or incorrect deadline can be costly
Document searchFind information among thousands of documentsIdentified reference sources; otherwise AI returns obsolete versions
Proposals and submissionsStructure content, summarise requirements, write a first versionNo invented references, services, amounts or commitments
VisualisationExplore intentions and atmospheresA convincing image is not an approved design document
Process automationRename, classify, notify, consolidateOften better handled through conventional automation, without AI

Before deploying document AI, you need to know which documents are authoritative.

Calculate returns across the complete process

Illustrative example: a practice writes 60 sets of minutes a month, taking 35 minutes each. With an AI assistant, the complete time, including review and correction, falls to 20 minutes.

  • Saving: 15 minutes × 60 = 15 hours per month.
  • At a fully loaded internal cost of CHF 75 per hour: CHF 1'125 per month, or around CHF 13'500 per year of theoretical capacity.

This is not yet a saving: licences, integration, training and maintenance must be deducted, then the practice must check what it actually does with the time released. Four indicators are enough to manage this: complete processing time, document quality, number of corrections and capacity actually reassigned.

AI that produces a document in thirty seconds but requires twenty minutes of correction must be assessed across the complete process.

Project data must not be the price of AI experimentation

A practice handles confidential drawings, information about sensitive buildings, personal data, contracts and documents belonging to its clients. None of this should be freely copied into just any AI assistant.

The number one risk: shadow AI

The most common danger is not an official AI project, but a colleague pasting a specification or contract into a personal ChatGPT account to save ten minutes. The practice then loses control: consumer terms of use, data retention and no access controls. Banning it without an alternative pushes the practice underground; providing an approved tool and clear rules is better.

Microsoft 365 Copilot: clean up permissions first

For a practice already using Microsoft 365, Copilot is often the most natural option. It only shows each user data for which they have at least read access. But that is precisely the trap: Microsoft points out that Copilot uses all data accessible to the user, including widely shared files whose existence they do not know about.

An HR folder or fee information shared too widely three years ago suddenly becomes discoverable with one question. Before enabling Copilot, Microsoft therefore recommends identifying and correcting oversharing in SharePoint and OneDrive (“Everyone” links, sites open to the entire organisation, inherited permissions).

Define an AI policy

A short internal policy should specify:

  • approved tools, and the prohibition on personal accounts for practice data;
  • permitted categories of data (public, internal, confidential client data);
  • processes requiring human approval and who is responsible;
  • rules for integrations connected to document spaces.

Before selecting a platform, also examine data processing, retention, processors, deletion and export options, and confidentiality commitments made to clients.

What about local or private AI?

Hosting a model in a controlled environment provides greater technical control, but brings its own costs: hardware, maintenance, security, computing capacity and model quality. It is not automatically the best option; the choice depends on the confidentiality required, expected performance and budget.

The aim: make AI useful without turning project information into an additional risk.

Security and backups: modernise without weakening production

A practice's IT contains years of work. A server failure, accidental deletion, compromised account or ransomware can affect ongoing projects and their deliverables. Security must therefore be built in from the outset.

The five priority protections

ProtectionWhat it covers
Identity managementMultifactor authentication for everyone, permissions limited to what is necessary, removal of unused accounts
MaintenanceInventory of obsolete systems, patches applied according to criticality
BackupsProtected copies, including at least one offline or immutable copy, independent of production credentials
RestorationRegular recovery tests for files, applications and BIM environments
Business continuityServices to restore first and acceptable timeframes, agreed with management

What should an architecture practice back up?

Far more than RVT, PLN or DWG files: libraries, families, templates, textures, linked models, application settings, BIMcloud server data, contractual documents and Microsoft 365 content. Where data lives on an external collaboration platform, check what the provider actually backs up and what remains your responsibility.

What recovery time is acceptable?

A small practice may tolerate its archives being unavailable for a few days. Prolonged loss of access to active projects, however, can cost a submission or competition. These objectives are agreed with management, then translated into realistic technical measures.

Modernisation must do more than make projects easier to open: it must ensure the practice knows how to recover them.

Standardise before replacing: an underestimated opportunity

Over the years, a practice's workstations diverge: software versions, Revit add-ins, graphics drivers, network settings, libraries, authentication methods and file locations. Some differences are justified; many simply reflect successive changes.

A controlled configuration makes installations reproducible, incompatibilities easier to diagnose and updates testable before deployment. Staff gain a consistent environment, and support interventions become faster.

Profiles rather than a single machine specification

ProfileMain useSizing priority
2D architectureDrawing and documentationResponsiveness, reliability
BIM designEveryday Revit or Archicad useProcessor, RAM, SSD
BIM coordinationComplex and linked modelsMemory, per-core performance
VisualisationRendering and real timeGPU, VRAM, RAM
Management / siteDocuments, meetings, monitoringMobility, battery life, security

This segmentation avoids two opposite mistakes: under-sizing production workstations and buying expensive machines for uses that do not need them.

Inventory-based replacement

Keep an inventory including each device's age, warranty, end of support and observed performance. A capable, maintained workstation stays in service; one that has become incompatible with required software is replaced or reassigned to a less demanding role.

The best hardware investment is not the one that replaces the most workstations, but the one that removes the limitations actually measured.

A twelve-month modernisation roadmap

A successful transformation does not require changing everything at once. For a practice with 10 to 30 staff, a progressive roadmap is easier to finance, explain and adopt. Here is an illustrative model, to be adapted after diagnosis.

MonthsObjectiveKey actionsDeliverable
1–2Measure and secure the foundationsInventory (workstations, licences, servers, access); measure Revit and Archicad slowdowns; check backups, multifactor authentication, administrator rights and systems at end of supportDiagnosis, risk register, prioritised actions
3–4Correct the main slowdownsOptimise storage, network and concurrent tasks; standardise workstation profiles; take regular performance measurementsBefore-and-after results, justified replacement plan
5–6Improve BIM collaborationNaming conventions, statuses and permissions following ISO 19650 principles; choose the collaboration method; representative pilot project; trainingPilot environment and document governance rules
7–8Test an AI use case or an automationClean up Microsoft 365 permissions; AI policy; limited pilot on a measured process, with a business ownerReasoned decision: continue, adapt or stop
9–10Consolidate security and continuityReview permissions, external access and Microsoft 365 backup; test an incident scenario; document responsibilitiesVerified procedures, resilience plan
11–12Evaluate and prepare for the next yearCompare indicators with the initial situation; identify real gains; budget planningManagement review, budgeted roadmap

This schedule is not rigid: a critical vulnerability or recurrent failure is addressed without waiting for its quarter. What matters is maintaining the logical sequence: measure, secure, optimise, then transform.

Editorial illustration of an architecture practice director and an IT consultant reviewing a phased modernisation roadmap.
AI-generated editorial illustration of a planning discussion.

What budget should a practice allow for IT modernisation?

The amount depends on existing systems, staff numbers, applications and objectives. Rather than a shopping list of technologies, a useful budget is structured into categories that support trade-offs.

Budget categoryWhat to allow for
Audit and diagnosisReview existing systems, measurements, recommendations
OptimisationNetwork, storage, configuration and process corrections
ReplacementWorkstations and servers that are genuinely under-sized
BIM collaborationLicences, hosting, configuration, support
AI and automationPilot, integration, training, quality control
Security and continuityProtection, backup (including Microsoft 365), monitoring, tests
OperationsSupport, maintenance, documentation, updates

Compare over three to five years

A local server requires greater upfront investment; a cloud platform turns some costs into recurring subscriptions. An honest comparison must include licences, energy, hosting, maintenance, backup, migrations, support and administration time, then set these against the value created. A more expensive solution may be justified by productivity gains; an attractive technology may be no more than an expense if it solves no important problem.

Prioritisation example

Management has CHF 25'000 available over twelve months (an illustrative assumption, not a quotation). Three projects are being considered: replace ten computers, modernise storage, improve model collaboration.

The diagnosis shows that the workstations remain suitable and slowdowns mainly come from storage and an unsuitable sharing workflow. Investing around CHF 40'000 in ten new workstations would then be unjustifiable: addressing the measured causes and planning only the necessary replacements is more rational.

Successful modernisation is not about spending the entire budget, but using it where it produces the most useful results.

How can modernisation success be measured?

A technical improvement is not necessarily a business benefit. A new server may show better figures without any visible effect for staff; a BIM platform may be heavily used while retaining version problems; an AI assistant may generate many documents without reducing total working time. That is why a few simple indicators are useful.

IndicatorMeasurementDesired result
BIM performanceOpening and synchronisation timesLess waiting
CollaborationVersion errors, rework, searchesFewer unproductive tasks
ReliabilityIncidents and interruption durationsBetter availability
ProductivityComplete time per taskUseful capacity released
QualityCorrections and document incidentsFewer errors
CostsTotal spending over the periodControlled operating cost
SatisfactionStaff feedbackBetter working conditions

An indicator is useful only with a baseline, a consistent measurement method and someone responsible for monitoring it. And twenty minutes released per colleague do not automatically create twenty minutes of revenue: management must decide how that capacity will be used.

Seven mistakes that undermine an architecture practice's modernisation

  1. Start by buying hardware. A new computer fixes neither a poorly structured model nor an unsuitable Revit workflow.
  2. Move everything to the cloud without analysing applications. Generic cloud storage does not replace a BIM collaboration platform designed for shared models.
  3. Deploy AI without an objective or a preliminary clean-up. A functioning tool is not an economic success, and Copilot enabled on disorganised permissions exposes sensitive data.
  4. Multiply tools that do the same thing. Each tool adds costs, access rights, integrations and training needs.
  5. Neglect backups and security. Facilitating collaboration while increasing the risk of loss or leakage weakens the business.
  6. Decide without the architects. A technically excellent solution may be rejected if it does not fit working methods.
  7. Never measure results. Without a before-and-after comparison, a useful investment cannot be distinguished from spending with no effect.

Technology does not transform a business on its own: adopted, measured changes create value.

Ten questions to ask before a modernisation project

Before signing a substantial quotation, the head of an architecture practice should obtain a clear answer to each of these questions:

  1. What concrete problem are we trying to solve?
  2. How many colleagues are affected, and what is the impact on their work?
  3. Have we measured the current situation?
  4. Can we improve existing systems before replacing them?
  5. Is the solution compatible with our Revit, Archicad and BIM workflows?
  6. What are the consequences for ongoing projects and external partners?
  7. How will our data be protected, backed up and recovered, and where will it be hosted?
  8. What will the complete cost be over three to five years?
  9. What measurable results do we expect, and by when?
  10. How can we change solution or provider if our needs evolve?

These questions turn a technology quotation into a genuine business decision.

FAQ: BIM, cloud and AI for architecture practices

Does an architecture practice have to move to the cloud?

No. The right architecture depends on software, expected performance, team distribution, connectivity and budget. A local, cloud or hybrid approach may be appropriate.

Is cloud faster for Revit?

Not necessarily. Revit Cloud Worksharing, included in Autodesk BIM Collaborate Pro, is designed for remote collaboration on shared models, but it fixes neither over-heavy models nor under-sized workstations.

Does Microsoft 365 back up our data?

No, not in the backup sense. Under the shared responsibility model, Microsoft provides service availability; data protection and restoration remain the company's responsibility. A dedicated backup stored outside the tenant is recommended.

Is hosting our data in Switzerland enough to guarantee sovereignty?

No. Microsoft offers Swiss regions (Geneva and Zurich), but a provider subject to US law remains affected by the CLOUD Act. The revised FADP requires knowing who can access the data and which processors are involved.

Can Microsoft 365 Copilot be enabled without preparation?

It is not recommended. Copilot uses all data accessible to the user, including files shared too widely. Oversharing in SharePoint and OneDrive must be corrected first.

Can AI automate site meeting minutes?

It can prepare and structure documents. Responsibilities, decisions and deadlines must nevertheless be approved by a competent person.

Which BIM standard applies in Switzerland?

The SN EN ISO 19650 series is the reference for BIM information management. SIA technical specification 2051 was withdrawn at the end of 2024, with the ISO 19650 series partly replacing it.

Must all workstations be replaced to modernise a practice?

No. Replacement should be based on observed performance, software requirements, warranty and each workstation's end of support.

Which AI project should come first?

A repetitive, measurable process with low error risk: preparing meeting minutes or controlled document search, for example.

Is an IT provider enough to define BIM strategy?

It designs and administers infrastructure. Model governance and production conventions are the responsibility of the BIM manager and business leads, with whom it must work.

How Sunitech supports architecture practices

An architecture practice does not need more technology, but infrastructure that truly supports design, collaboration and project management. At Sunitech, we support SMEs in Geneva, Lausanne and throughout French-speaking Switzerland in managing, securing and developing their IT.

  • Audit and performance: workstations, servers, network, storage and slowdowns affecting production.
  • BIM architecture and collaboration: choosing local, cloud or hybrid according to your Revit and Archicad workflows.
  • Microsoft 365: identities, sharing, permissions, Copilot readiness and dedicated backup.
  • Security and continuity: strong authentication, endpoint protection, tested backups, recovery procedures.
  • AI and automation: identifying high-potential processes, a pilot and measurement of results.
  • Governance: a roadmap aligned with your needs, budget and priorities.

When a subject involves modelling or BIM coordination, we work with your BIM manager and application specialists.

Are you considering modernising your practice's IT? Before replacing your servers, migrating your models or multiplying AI subscriptions, let us identify the investments that are actually useful. Discuss your project with Sunitech

Conclusion: the best transformation is the one your architects feel every day

BIM, AI and cloud are real opportunities, but adopting a technology is not an improvement in itself. A practice can have the latest software, expensive workstations and comprehensive cloud services while still wasting time in its processes. Conversely, a practice that standardises workstations, structures its information, makes backups reliable and improves exchanges can achieve substantial results without replacing everything.

The best IT system is not the one with the most cloud, AI or BIM software. It is the one that lets your architects spend more time designing, collaborating and building.

Before changing everything, start by measuring what really deserves to change.

TopicsArchitecture practicesSwiss SMEs
Back to resources